• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin » 30

30

Search

You can find the results of your search below.

Exact match
  • Exact match
  • Starts with
  • Ends with
  • Contains
@planning:refurbishment_with_passive_house_components:thermal_envelope
  • Any namespace
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Fulltext results:

Improving thermal bridges and airtightness in existing buildings
2 Hits, Last modified: 6 years ago
ssigkeit von Baustoffen und Baukonstruktionen, gi 30 (1928). Raisch, E.: Air permeability of building materials and structures, gi 30 (1928). \\ **[Sedlbauer 2002]** Sedlbauer, K.; G
Airtightness and airtightness measurement
1 Hits, Last modified: 10 months ago
\ |{{ :picopen:blowerdoor_bild01_en_mit_logo.png?300 }}|{{ :picopen:blowerdoor_bild02_en_mit_logo.png?300 }}| |//**Figure 1: Basic measurement setup for... ntrast, the actual test normally takes only about 30 to 40 minutes, therefore saving time here wouldn’... ing on the type of construction, there are 150 to 300 m of leak-prone component connections [[.:airtig
Floor Replacement: Svartbäcksvägen
1 Hits, Last modified: 8 years ago
loor was dug out and replaced by a new floor with 300mm FOAMGLAS® insulation in all rooms. As in many
Insulation measures for the external envelope
1 Hits, Last modified: 6 years ago
ing roof overhang will usually be too short for a 30 cm insulation layer. Alternatively, if the roof i

Page Tools

  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN