• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin ยป all

all

Search

You can find the results of your search below.

Contains
  • Exact match
  • Starts with
  • Ends with
  • Contains
@construction:quality_assurance
  • Any namespace
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Fulltext results:

Quality Assurance - Thermal bridges
23 Hits, Last modified: 7 years ago
er. In the German energy regulations (EnEV), overall thermal bridge losses are calculated with an addi... s at the plinth and for connections of the inner wall to the unheated basement or to the floor slab. In... nt modernisation, it is strongly recommended that all thermal bridges be included, along with their len... d for renovations in the area above the plinth if all connection details are redone. Reference will be
Quality Assurance: Nuremberg case study
3 Hits, Last modified: 5 years ago
p could often be achieved for the roof, external wall and basement ceiling by means of extensive therma... to drying processes taking place in the external wall that is damp from previous years. There were sur... nt in the case of the other building services installations with reference to the thermal protection of
Quality Assurance - Final approval and initial use
1 Hits, Last modified: 10 years ago
parties to the contract demand it, the service shall be deemed to have been accepted twelve working da... med to use in whole or in part, then acceptance shall be deemed to have taken place six working days af... ervices should also take place. At the same time, all project documents including the latest plans, ope

Page Tools

  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN