Fulltext results:
- Quality Assurance - Thermal bridges
- er. In the German energy regulations (EnEV), overall thermal bridge losses are calculated with an addi... s at the plinth and for connections of the inner wall to the unheated basement or to the floor slab. In... nt modernisation, it is strongly recommended that all thermal bridges be included, along with their len... d for renovations in the area above the plinth if all connection details are redone. Reference will be
- Quality Assurance: Nuremberg case study
- p could often be achieved for the roof, external wall and basement ceiling by means of extensive therma... to drying processes taking place in the external wall that is damp from previous years. There were sur
- Quality Assurance - Final approval and initial use
- parties to the contract demand it, the service shall be deemed to have been accepted twelve working da... med to use in whole or in part, then acceptance shall be deemed to have taken place six working days af... ervices should also take place. At the same time, all project documents including the latest plans, ope