Fulltext results:
- Playing on the Passive House hill - the new kindergarten in the Heidenau city park @examples:non-residential_buildings:passive_house_kindergartens:central_europe
- the building envelope that can be experienced at all levels. The floor plan follows a curved line and ... as a door opening onto the terraces at the front. All areas follow the same basic design consisting of ... Passive House and has a U-value of 0.11 W/(m²K). All wooden windows and the curtain wall facade consis... heat exchanger with an effectiveness of 90% which allows for the heat of the used air to be “recovered”
- Riedberg Passive House School, Frankfurt, Germany @examples:non-residential_buildings:passive_house_schools
- ity Council in the year 2002 already stated that “all future kindergartens and schools will be built in... nal energy value** of only **50.9 kWh/(m²a)** for all applications (heating, hot water, all electricity) * and only **59.2 kWh/(m²a)** for **primary ener... the operation of the ventilation system was good all throughout. The results of the Passive House scho
- Riedberg Passive House School, Frankfurt, Germany @examples:non-residential_buildings:passive_house_schools:central_europe
- ity Council in the year 2002 already stated that “all future kindergartens and schools will be built in... nal energy value** of only **50.9 kWh/(m²a)** for all applications (heating, hot water, all electricity) * and only **59.2 kWh/(m²a)** for **primary energ... the operation of the ventilation system was good all throughout. The results of the Passive House scho
- Playing in a Passive House - A timber/mudbrick building for children @examples:non-residential_buildings:passive_house_kindergartens:central_europe
- }}| |//**Build-up of the Passive House.**//|\\ \\ All external walls and the roof are timber frame cons... g the glazed area and improving the insulation of all external walls. After a year of use, it became ob... a hygroscopic coating on the heat exchanger also allows moisture recovery from the air. In this way, t... natural ventilation through windows is ensured at all times and is only assisted by the controlled vent
- Secondary School in Baesweiler, Germany @examples:non-residential_buildings:passive_house_schools
- mmited itself to energy efficient optimisation of all official building stock in a well-thought-out cou... s pre-cooled by the geothermal probe system.\\ \\ All wings of the building are constantly supplied wit
- Secondary School in Baesweiler, Germany @examples:non-residential_buildings:passive_house_schools:central_europe
- mmited itself to energy efficient optimisation of all official building stock in a well-thought-out cou... s pre-cooled by the geothermal probe system.\\ \\ All wings of the building are constantly supplied wit
- Lengdorf nursery school, Germany @examples:non-residential_buildings:passive_house_kindergartens:central_europe
- t, Germany\\ \\ **Statics:**\\ IB Jochum,\\ 82239 Alling, Germany\\ \\ **Outdoor facilities:**\\ [[http