Fulltext results:
- Airtightness measurements in Passive Houses
- ompletion of the building; however, by this time, all installations, screed, cladding etc. will have be... such cases, these must be sealed up temporarily. All seals and preparations must be mentioned in the t... 9972:**\\ The envelope area is the total area of all floors, walls and ceilings enclosing the volume under consideration, including all walls and floors that are below ground level. Int
- General principles for improving airtightness @planning:airtight_construction:general_principles
- l planning and conscientious implementation using all these methods. Details about the implementation of all essential connections and penetrations are availa... Experts for Airtightness at www.flib.de).\\ \\ In all certificates of the Passive House Institute for b... tilators. It would also be better to concentrate all necessary penetrations in as few places as possib
- Checklist: Test reports of airtightness measurements @planning:airtight_construction:general_principles
- be easily confirmed using this checklist: * Is all general information included? * Tester: nam
- Why build an airtight house? – Leakage problems @planning:airtight_construction:general_principles
- h this is to build the envelope tight - and avoid all these problems. * there is an additional ben