Fulltext results:
- Overall retrofit plan for step-by-step retrofits to EnerPHit Standard
- ave been the focus of a consortium of 14 partners all across Europe. The share of step-by-step retrofit... ed for will actually be achieved after completing all steps. The pre-certification can take place as so... owing prerequisites have been met: • The ERP and all other necessary documents in accordance with buil... ptimal final result can securely be obtained over all steps with manageable effort. The ERP output file
- Refurbishment with Passive House components - introduction
- newed anyway, then scaffolding will be put up and all remaining measures will be carried out in any cas... nts is not only economical but also preferable in all aspects. The economic situation is even better f... he building owner and residents also benefit from all the other advantages, which have already been exp... tion. An exhaust air outlet should be planned for all rooms with high levels of humidity. Constantly ex
- Step-by-step Retrofits towards EnerPHit Standard in social housing in Spain
- , usually in the first winter season, because not all relevant factors had been considered in the plann... As the owner cannot afford to undertake the works all at once, the refurbishment will be performed step... and cooling demands as far as possible but above all to increase the surface temperature, raise the co... ments cost is 13,726 € (i.e. 176.88 €/m2). Since all the measures described above are related to works
- Airtightness and airtightness measurement @planning:refurbishment_with_passive_house_components:thermal_envelope
- l_features_in_modernisations#literature|[Darup et all 2005] ]]). With professional planning and implem... 29] ]]. The envelope surface is the total area of all floors, walls and ceilings that enclose the volum... r to prevent any deficiencies in the workmanship, all construction details should be as simple to carry... Wood-based panels \\ \\ Airtightness concepts of all kinds usually consist of a combination of these m
- Component Award 2016: Affordable ventilation solutions for retrofits
- uch as ventilators with constant volume flow) are all the greater the better the ventilation unit’s eff... to investment costs for the ventilation unit and all required components, each offer includes planning... must be described and included in the cost. * All ventilation systems certified as Passive House co... ssment is based on a lifecycle analysis including all costs (the unit, components, duct network, instal
- Improving thermal bridges and airtightness in existing buildings @planning:refurbishment_with_passive_house_components:thermal_envelope
- uninterrupted layer of thermal insulation applied all around the envelope is represented schematically.... . pumice), but the results are similar, and above all the modernisation approaches hardly differ from e... e, one can be sure to remain on the safe side for all details. \\ In order to achieve a good standard
- Building Integrated Photovoltaics (BIPV) in Step by Step Retrofitting Projects
- ed surface temperatures and ambient temperatures. All external meteorological parameters were also logg
- Step-by-step deep retrofit and building integrated façade/roof on a 'million program' house
- ildings (similar to many masonry structures built all over Europe in the mid-late 1900’s) are now in gr
- Windows in a step-by-step retrofit
- dow frame can easily have insulation added to it. All other solutions turned out to be detrimental: If
- Influence of retrofitting on daylighting @planning:refurbishment_with_passive_house_components:mechanical_systems
- assive_house_conference_contributions_4|List]] of all released conference proceedings of the 17th Inter
- Floor Replacement: Svartbäcksvägen @planning:refurbishment_with_passive_house_components:thermal_envelope
- by a new floor with 300mm FOAMGLAS® insulation in all rooms. As in many places in Sweden, the ground be