• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin » any

any

Search

You can find the results of your search below.

Starts with
  • Exact match
  • Starts with
  • Ends with
  • Contains
@planning:airtight_construction
  • Any namespace
  • planning:airtight_construction:general_principles (3)
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Fulltext results:

General principles for improving airtightness @planning:airtight_construction:general_principles
3 Hits, Last modified: 10 years ago
the whole building envelope with a pencil without any breaks in each sectional drawing. In the details ... tered over, or a plastering strip. - **Thirdly, any necessary penetrations must be planned **: electr... ight envelope is implemented continuously without any interruptions. This must be carefully planned an
Airtightness Measurement of High-Rise Buildings
2 Hits, Last modified: 3 years ago
e pressure difference of 10% must not be exceeded anywhere within the building envelope cannot be met under any circumstances. In order to still be able to carry
Checklist: Test reports of airtightness measurements @planning:airtight_construction:general_principles
1 Hits, Last modified: 22 months ago
hould be carried out before the measurements, and any large leaks should be rectified and this should b
Why build an airtight house? – Leakage problems @planning:airtight_construction:general_principles
1 Hits, Last modified: 6 years ago
es. \\ It's a bad idea to think, that you'll gain anything from alleviating the airtightness requiremen

Page Tools

  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN