• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin ยป at

at

Search

You can find the results of your search below.

Ends with
  • Exact match
  • Starts with
  • Ends with
  • Contains
@construction:quality_assurance
  • Any namespace
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Fulltext results:

Quality Assurance - Thermal bridges
11 Hits, Last modified: 7 years ago
pairing the general level of comfort and health that the building can offer. In the German energy reg... ted, particularly for existing connection details at the plinth and for connections of the inner wall ... e thermal bridge, it is necessary to extend the heat flow path and thus improve the thermal bridge los... cient modernisation, it is strongly recommended that all thermal bridges be included, along with their
Quality Assurance: Nuremberg case study
3 Hits, Last modified: 5 years ago
lated weak points; neither were there any flaws that could have been caused by incomplete planning or ... hic imaging of the exterior and interior showed that: * The interior surface temperatures were > 15... ruled out * The lowest temperatures are found at the glass edge seal and at the base board of the lower corners of the building. The temperatures at t
Quality Assurance - Final approval and initial use
1 Hits, Last modified: 10 years ago
se ====== In legal terms, final approval means that the project has fulfilled certain criteria and is... ut in accordance with the contract. Any defects that are found during the final inspection must be rem... within a specified period of time. Payment is due at the time of final approval, the limitation period... agraph 644 of the German Civil Code. This means that the burden of proof relating to any defects, amon

Page Tools

  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN