Fulltext results:
- Airtightness and airtightness measurement
- use discomfort for occupants and there are high heat losses. That is why airtightness standards have been set for many years and why we still have them in... rrent regulations. It is still widely beleived that poor airtightness ensures good ventilation in dwe... tial drafts in poorly airtight old buildings even at moderate wind speeds but during periods of mild a
- Improving thermal bridges and airtightness in existing buildings
- ign – i.e. optimising the details to the extent that the thermal bridge addition becomes smaller or eq... in the case of modernisations of old buildings? That is highly desirable, because moisture damage due ... Fig. 1 shows a section through an old building that is to be modernised. The additional uninterrupted... idges: * Masonry projecting out of the envelope at the knee wall * Wood beam ceilings as intermed
- Floor Replacement: Svartbäcksvägen
- ater installation of a MVHR system, will ensure that there is no danger from the radioactive gas in th... g to an acceptable minimum. This helps to avoid heat loss and condensation (which in turn may damage t... t, the (static model) minimum surface temperature at -10°C ambient temperature is +15.3°C – which is h... European Commission are responsible for any use that may be made of the information contained therein.
- Insulation measures for the external envelope
- ity ....**|| \\ On the other hand, the question that arises in connection with step-by-step modernisat