Fulltext results:
- Quality Assurance - Thermal bridges
- e detail formation, these transmission losses are between 10 and 20%. In unfavourable cases they may even be 30%. The effects can be serious in terms of the low temperatures of the interior surfaces and the res... or refurbishments, however, these values can only be used for newly built. Almost invariably, unfavour
- Quality Assurance: Nuremberg case study
- ====== Quality Assurance: Nuremberg case study ====== ===== Introduction ===== === Demonstration project "Modernising a block of flats in Nuremberg" === The results of the quality assurance mea... ernisation using Passive House components in Nuremberg have been summarised in this article. The project was carried out by the wbg Nuremberg; the archite
- Quality Assurance - Final approval and initial use
- r is entitled to final approval when the work has been carried out in accordance with the contract. An... s that are found during the final inspection must be remedied by the contractor within a specified per... contractor’s request. If no formal acceptance has been agreed in the contract and none of the parties to the contract demand it, the service shall be deemed to have been accepted twelve working days