• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin » be

be

Search

You can find the results of your search below.

Contains
  • Exact match
  • Starts with
  • Ends with
  • Contains
@construction
  • Any namespace
  • construction:quality_assurance (3)
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Matching pagenames:

  • Quality Assurance: Nuremberg case study

Fulltext results:

Quality Assurance - Thermal bridges @construction:quality_assurance
53 Hits, Last modified: 7 years ago
e detail formation, these transmission losses are between 10 and 20%. In unfavourable cases they may even be 30%. The effects can be serious in terms of the low temperatures of the interior surfaces and the res... or refurbishments, however, these values can only be used for newly built. Almost invariably, unfavour
Quality Assurance: Nuremberg case study @construction:quality_assurance
40 Hits, Last modified: 5 years ago
====== Quality Assurance: Nuremberg case study ====== ===== Introduction ===== === Demonstration project "Modernising a block of flats in Nuremberg" === The results of the quality assurance mea... ernisation using Passive House components in Nuremberg have been summarised in this article. The project was carried out by the wbg Nuremberg; the archite
Quality Assurance
19 Hits, Last modified: 3 years ago
vision, up to the time of final approval. It must be ensured that all that has been arranged in the plans, especially the implementation plans, is also im... echnical regulations and relevant provisions must be complied with in the process. For innovative projects in particular, requirements often go far beyond regulations as the technology used in such st
Quality Assurance - Final approval and initial use @construction:quality_assurance
6 Hits, Last modified: 10 years ago
r is entitled to final approval when the work has been carried out in accordance with the contract. An... s that are found during the final inspection must be remedied by the contractor within a specified per... contractor’s request. If no formal acceptance has been agreed in the contract and none of the parties to the contract demand it, the service shall be deemed to have been accepted twelve working days

Page Tools

  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN