• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin » be

be

Search

You can find the results of your search below.

Exact match
  • Exact match
  • Starts with
  • Ends with
  • Contains
@construction:quality_assurance
  • Any namespace
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Matching pagenames:

  • Quality Assurance: Nuremberg case study

Fulltext results:

Quality Assurance - Thermal bridges
16 Hits, Last modified: 7 years ago
n 10 and 20%. In unfavourable cases they may even be 30%. The effects can be serious in terms of the low temperatures of the interior surfaces and the res... or refurbishments, however, these values can only be used for newly built. Almost invariably, unfavourable thermal bridge factors can be expected, particularly for existing connection de
Quality Assurance: Nuremberg case study
3 Hits, Last modified: 5 years ago
\ The planned standard of workmanship could often be achieved for the roof, external wall and basement... s were > 15.5°C everywhere; thus mould growth can be ruled out * The lowest temperatures are found... ken in the case of wooden beam ceilings proved to be very essential. Adjustment of the ventilation sys
Quality Assurance - Final approval and initial use
2 Hits, Last modified: 10 years ago
s that are found during the final inspection must be remedied by the contractor within a specified per... ties to the contract demand it, the service shall be deemed to have been accepted twelve working days ... to use in whole or in part, then acceptance shall be deemed to have taken place six working days after... s if possible. Documentation of acceptance should be prepared in which any reservations concerning def

Page Tools

  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN