Fulltext results:
- Quality Assurance - Thermal bridges @construction:quality_assurance
- n 10 and 20%. In unfavourable cases they may even be 30%. The effects can be serious in terms of the low temperatures of the interior surfaces and the res... or refurbishments, however, these values can only be used for newly built. Almost invariably, unfavourable thermal bridge factors can be expected, particularly for existing connection de
- Quality Assurance
- vision, up to the time of final approval. It must be ensured that all that has been arranged in the pl... echnical regulations and relevant provisions must be complied with in the process. For innovative proj... f further local or national technical regulations be carried out by the designer. Designers should inf... ability extending beyond these risks. This should be done carefully in written form: it is advisable t
- Quality Assurance: Nuremberg case study @construction:quality_assurance
- \ The planned standard of workmanship could often be achieved for the roof, external wall and basement... s were > 15.5°C everywhere; thus mould growth can be ruled out * The lowest temperatures are found... ken in the case of wooden beam ceilings proved to be very essential. Adjustment of the ventilation sys
- Quality Assurance - Final approval and initial use @construction:quality_assurance
- s that are found during the final inspection must be remedied by the contractor within a specified per... ties to the contract demand it, the service shall be deemed to have been accepted twelve working days ... to use in whole or in part, then acceptance shall be deemed to have taken place six working days after... s if possible. Documentation of acceptance should be prepared in which any reservations concerning def