Fulltext results:
- The world’s first Passive House, Darmstadt-Kranichstein, Germany
- therefore need no active heating. Such houses can be kept warm "passively", solely by using the existi... that energy optimisation for buildings should not be limited solely to heating energy; in fact, all household energy consumption had to be minimised.** Otherwise it would be possible to reduce the heating energy requirement to "zero" by usi
- Multi-family Passive House buildings in Germany
- aus.htm|Hamburg Energy Office]].\\ The report can be downloaded at ([[http://www.passiv.de/04_pub/Lite... etails, costs analyses\\ and measured results can be found here:\\ [[http://www.passivhaustagung.de/Pa... proves that the Passive House Standard\\ can also be implemented in publicly funded multi-storey build... ew "non Passive House" building. The report\\ can be found here: [[http://www.cepheus.de/Kurzberichte/
- The Nestwerk Residential Project in Dresden
- rtments is between 650W and 1,600W. All rooms can be heated via the supply air with reserves for highe... doors on all four sides. The supply air duct can be shut separately and the sound-proof air transfer opening can be sealed. This way, the room temperature can be adjusted, and opening the bedroom windows at night does