Fulltext results:
- Secondary School in Baesweiler, Germany
- to energy efficient optimisation of all official building stock in a well-thought-out course of action. As ... luding a user survey and detailed analysis of the building data, targets were set for each building which ranged from the minimum building standard based on EnEV 2009 to the Passive House Standard. The resul
- Riedberg Passive House School, Frankfurt, Germany
- fter a construction period of only 14 months. The building with a dual-field sports hall was based on the de... length of the cold ventilation ducts through the building, **the effective heat recovery rate** unfortunate... *. This shows that cold ducts leading through the building should be as short as possible even if they are i... insulation apron approach), the drying out of the building and the lack of some optimisations. The **treate