Fulltext results:
- Playing on the Passive House hill - the new kindergarten in the Heidenau city park @examples:non-residential_buildings:passive_house_kindergartens:central_europe
- nstead of flattening\\ the existing hill, the new building was too be integra-\\ ted into it. The structure of the building was to be fitted\\ into the area and become a par... s concept is realised by the organic shape of the building envelope that can be experienced at all levels. T... ery well into the surroundings. The kindergarten building does not interfere with the existing park or the
- Secondary School in Baesweiler, Germany @examples:non-residential_buildings:passive_house_schools
- to energy efficient optimisation of all official building stock in a well-thought-out course of action. As ... luding a user survey and detailed analysis of the building data, targets were set for each building which ranged from the minimum building standard based on EnEV 2009 to the Passive House Standard. The resul
- Playing in a Passive House - A timber/mudbrick building for children @examples:non-residential_buildings:passive_house_kindergartens:central_europe
- == Playing in a Passive House - A timber/mudbrick building for children ====== Author: Dipl. Ing. Olaf Reit... fter the River Mulde flood in 2002, a replacement building needed to be built and Reiter and Rentzsch Archit... ooms thanks to the construction method using safe building materials and to the controlled ventilation syste... structions, the use of wood at the corners of the building was minimised (see drawing). The floor slab was i
- Secondary School in Baesweiler, Germany @examples:non-residential_buildings:passive_house_schools:central_europe
- to energy efficient optimisation of all official building stock in a well-thought-out course of action. As ... luding a user survey and detailed analysis of the building data, targets were set for each building which ranged from the minimum building standard based on EnEV 2009 to the Passive House Standard. The resul
- Riedberg Passive House School, Frankfurt, Germany @examples:non-residential_buildings:passive_house_schools
- fter a construction period of only 14 months. The building with a dual-field sports hall was based on the de... length of the cold ventilation ducts through the building, **the effective heat recovery rate** unfortunate... *. This shows that cold ducts leading through the building should be as short as possible even if they are i... insulation apron approach), the drying out of the building and the lack of some optimisations. The **treate
- Riedberg Passive House School, Frankfurt, Germany @examples:non-residential_buildings:passive_house_schools:central_europe
- fter a construction period of only 14 months. The building with a dual-field sports hall was based on the de... length of the cold ventilation ducts through the building, **the effective heat recovery rate** unfortunate... *. This shows that cold ducts leading through the building should be as short as possible even if they are i... insulation apron approach), the drying out of the building and the lack of some optimisations. The **treate
- Passive House office buildings
- hausprojekte.de/index.php?lang=en | Passive House Building Database]] \\ iPHA provides a map of Certified Pa
- Passive House schools - best practice examples
- hausprojekte.de/index.php?lang=en | Passive House Building Database]] - you can search for "schools" on that
- Lengdorf nursery school, Germany @examples:non-residential_buildings:passive_house_kindergartens:central_europe
- ermany\\ [[info@vallentin-architektur.de]]\\ \\ **Building services:**\\ [[http://www.itg-landshut.de/|IB IT