• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin » building

building

Search

You can find the results of your search below.

Exact match
  • Exact match
  • Starts with
  • Ends with
  • Contains
@planning:airtight_construction:general_principles
  • Any namespace
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Fulltext results:

Why build an airtight house? – Leakage problems
12 Hits, Last modified: 6 years ago
kage problems ====== The external envelope of a building should be as airtight as possible and this doesn’t only apply to Passive Houses. * building damage caused by water vapour that is transported... airtightness of the envelope (see illustration). Building damage is mostly due to the absence of airtightne... y air and exhaust air spaces only function if the building envelope is sufficiently airtight. * Airtightn
General principles for improving airtightness
7 Hits, Last modified: 10 years ago
key principle for planning the airtightness of a building is that of the "continuous uninterrupted airtight building envelope", that can be outlined using the “red pe... on**//). It should be possible to trace the whole building envelope with a pencil without any breaks in each... what is more important is the\\ basic concept. A building envelope can only be airtight\\ if it consists of
Airtightness test
5 Hits, Last modified: 6 years ago
uous and adequate exchange of air (see [[planning:building_services:ventilation:basics:types_of_ventilation|... b>-value** measures the total leakage through the building envelope. The n<sub>50</sub>-value (in h<sup>-1</... ter column) is created between the inside of the building and the outside by means of a blower door test. T... e (e.g. a door) creating underpressure inside the building in order to detect leakages. The actual test invo
Checklist: Test reports of airtightness measurements
3 Hits, Last modified: 22 months ago
room-by-room calculation of the air volume of the building included? Is the calculation correct? * Has the... been documented? * Has temporary sealing of the building envelope been recorded (sealing of outdoor air an... onditions apply. Please contact your certifier or building.certification@passiv.de {{:picopen:v1.2_checklis

Page Tools

  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN