• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin » building

building

Search

You can find the results of your search below.

Exact match
  • Exact match
  • Starts with
  • Ends with
  • Contains
@planning:refurbishment_with_passive_house_components:thermal_envelope
  • Any namespace
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Matching pagenames:

  • Improving thermal bridges and airtightness in existing buildings

Fulltext results:

Airtightness and airtightness measurement
55 Hits, Last modified: 11 months ago
====== ===== Basic and airtightness in existing building===== ===== Airtightness – how and why? ===== T... of air flowing in through joints and gaps in the building envelope. A large percentage of building damage is caused by leaks in the building envelope. Sound insulation is reduced, drafts cause discomfort fo
Improving thermal bridges and airtightness in existing buildings
6 Hits, Last modified: 6 years ago
particular. Fig. 1 shows a section through an old building that is to be modernised. The additional uninterr... en:fig.2_pb24.png?350|}}| |//**Figure 2: Standard building components – status quo**//|\\ The initial assump... rative to also insulate the exterior walls of the building with adequate insulation thicknesses if new airti... , Oktober 2002. Feist, W.; John, M.; Pfluger, R.: Building physics monitoring of the construction project Je
Insulation measures for the external envelope
6 Hits, Last modified: 6 years ago
e external envelope ====== Modernisation of the building envelope without insulation ("cosmetic refurbishm... period of time [AKKP24]. Depending on the type of building component, these figures may be even more extreme... ngs – Quality Assurance for the Jean-Paul-Platz 4 building project in Nuremberg, Final Report, in: Jean-Paul-Platz 4 in Nuremberg – energy-efficient building refurbishment with Faktor 10, final report of the
Floor Replacement: Svartbäcksvägen
2 Hits, Last modified: 8 years ago
es when fitting a new ground floor to an existing building is to reduce thermal bridging to an acceptable mi... ss and condensation (which in turn may damage the building structure and/or cause mould growth). [{{:picope

Page Tools

  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN