• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin » Passive House Construction

construction

Search

You can find the results of your search below.

Contains
  • Exact match
  • Starts with
  • Ends with
  • Contains
@planning:building_services:ventilation
  • Any namespace
  • planning:building_services:ventilation:basics (1)
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Fulltext results:

Comparison of energy performance of ventilation systems using passive vs. active heat recovery
6 Hits, Last modified: 2 years ago
Types of ventilation @planning:building_services:ventilation:basics
3 Hits, Last modified: 23 months ago
ating period at all (see also [[Planning:Airtight construction]]): \\ * Wind and airflow caused by temperatur... s with strong winds (following picture). * New constructions in many countries such as Germany are so airtigh... rmany this could be an effective solution for new constructions built to EnEV standard and for refurbishment of
Checklist for Design: Ventilation System in a residential Passive House Building
2 Hits, Last modified: 2 years ago
Differentiation between Vv and Vn50 values
2 Hits, Last modified: 2 years ago
will be used for calculating [[planning:airtight_construction:general_principles:blower_door_test|the n50 air l... ilding Certification Guide]] [[planning:airtight_construction:airtightness_measurements_in_passive_houses|Airti
The ventilation system – there is no alternative
1 Hits, Last modified: 3 years ago
== Increasing the level of airtightness in a new construction or old building for reasons of energy conservatio
construction.txt · Last modified: 2014/09/18 18:19 by 127.0.0.1

Page Tools

  • Show page
  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN