Fulltext results:
- Playing on the Passive House hill - the new kindergarten in the Heidenau city park @examples:non-residential_buildings:passive_house_kindergartens:central_europe
- building envelope that can be experienced at all levels. The floor plan follows a curved line and the un... tomatically placing emphasis on the entrance. The level side at the opposite end is accessible and can be... and lobby, the standard setting provides a basic level of ventilation. A maximum volumetric air flow i... e group rooms. For this, the users can select two levels on a key switch: partial ventilation and maximum
- Playing in a Passive House - A timber/mudbrick building for children @examples:non-residential_buildings:passive_house_kindergartens:central_europe
- large thermal mass in the building and a constant level of indoor air humidity.\\ \\ |{{ :picopen:kinderg... of fresh air. Because of the very high occupation level (2.5m² per child) 300m³/h of fresh air are requir... te of 1.6. This can lead to very low air humidity levels in the rooms in winter. In cooperation with Mr. ... it is possible to maintain the minimum acceptable level of air humidity in the room even on very cold win
- Secondary School in Baesweiler, Germany @examples:non-residential_buildings:passive_house_schools:central_europe
- Riedberg Passive House School, Frankfurt, Germany @examples:non-residential_buildings:passive_house_schools:central_europe
- of the project were met. The results were a high level of comfort with energy savings of 90 % and a very
- Riedberg Passive House School, Frankfurt, Germany @examples:non-residential_buildings:passive_house_schools
- of the project were met. The results were a high level of comfort with energy savings of 90 % and a very