• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin » no

no

Search

You can find the results of your search below.

Contains
  • Exact match
  • Starts with
  • Ends with
  • Contains
@construction
  • Any namespace
  • construction:quality_assurance (3)
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Fulltext results:

Quality Assurance: Nuremberg case study @construction:quality_assurance
7 Hits, Last modified: 5 years ago
ographic imaging of the exterior and interior did not show any uncalculated weak points; neither were ... a value of n<sub>50</sub> = 0.35 h<sup>-1</sup>. No serious leaks were detected. The care taken in th... l. Adjustment of the ventilation system still was not optimal. Simplifications and relevant support on... aus Institut, Darmstadt, 2003. (Passive House technology in existing buildings – Qualtiy assurance for
Quality Assurance - Thermal bridges @construction:quality_assurance
7 Hits, Last modified: 7 years ago
ases, these specific values can be achieved for renovations in the area above the plinth if all connec... of the thermographic image there is a similar but non-renovated existing building (source: PHI)//}}] [{{ :picopen:thermographic_image_of_the_inside_of_th... rmal bridges effects. Studying a cross-section is not enough; three-dimensional problematic areas and
Quality Assurance
5 Hits, Last modified: 3 years ago
sions must be complied with in the process. For innovative projects in particular, requirements often go far beyond regulations as the technology used in such structures has often not yet been included in the standards. The special features of... about the advantages and risks associated with innovative solutions and in return, clients should exe
Quality Assurance - Final approval and initial use @construction:quality_assurance
1 Hits, Last modified: 10 years ago
s, lies with the contracting party. This is also known as the reversal of the burden of proof.\\ \\ Fo... elve working days of the contractor’s request. If no formal acceptance has been agreed in the contract and none of the parties to the contract demand it, the s... e been accepted twelve working days after written notification of the completion of work. If the contr

Page Tools

  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN