Fulltext results:
- Classic, Plus, Premium: The Passive House classes and how they can be reached @certification:passive_house_categories
- buildings are based on old supply systems and do not work in the new one with an increasing share of ... l three classes. But heating energy demand does not tell the whole story; after all, heating energy ... with a PER of 1.0. It is exported to the grid and not calculated against the building’s energy demand.... ample, solar power generated in the summer should not be treated as though it directly offsets heating
- PER-factors for electricity use: Location & application specific decarbonisation @certification:passive_house_categories
- .5 % of the annual yield. Offshore wind energy is not considered at this stage – the calculations are ... ightly on the safe side in this regard. Last but not least, the electricity produced from hydropower ... h thermal storage, η = 90 %). These additions are not scaled according to the demand i.e. a building w... he fixed percentage of hydropower. Both extremes (no solar or no wind), as well as four intermediate s
- Certified Passive House Components
- gs and efficient building engineering systems and not by living “economically”. Besides careful planni... ng the Passive House Standard. For the user it is not easy to determine clearly the relevant specific ... paces, derived from ISO7730). Where this alone is not sufficient for formulating the criteria, efficie... ith reference to realistic implementation and are not based on artificial laboratory conditions. **Ce
- Addendum concerning the use of vacuum insulation
- in a controlled manner, and only where standard, non-vacuum insulation materials cannot be installed or are not economical (under consideration of life cycle co... ations are made: * Panels should be tested by a notified body or other recognized testing institute ... s (VIP)); performance should be guaranteed by the notified body or testing institute for at least 50 y
- Certification of buildings in which the ground floor is used for commercial purposes (for PHPP 9, revised 5-Sep-2016)
- etc. Often the user of the ground floor areas is not known when the energy balance is set up. Options... in the following table. For those cases which are not shown in this table, please contact the PHI. //... ace exists here in part (the system boundary does not have to continue down to the ground in the stair... nd structural integrity, and heating costs should not greatly exceed those for the other floors. Alter
- Evaluation of server and server room efficiency for non-residential buildings that exceed the primary energy criterion
- aluation of server and server room efficiency for non-residential buildings that exceed the primary en... ency of the main electricity consumers. Currently no fixed criteria for this are available. The follow... ive simulations and real-time applications, it is not possible to make a general statement as to what ... der to find out whether a service is efficient or not, the power consumption can be put into relation
- Building Criteria: Overview of Changes
- ria and replaces the previous evaluation based on non-renewable primary energy (PE). For a transitiona... criteria were adapted in such a way that they can now be applied without any restrictions in all clima... rgy Building Standards, including residential and non-residential buildings). ===Three become one ==... of three documents (PH residential buildings, PH non-residential buildings, EnerPHit) have been combi
- Building Certification
- uide as a separate document. Passive Houses are not introduced by law or regulation - they are a vol... e. individual structural or technical details are not prescribed, but an overall coherent planning wit... and Passive House organisations worldwide. Please note that translations of criteria are purely informative and not binding: [[.:certified_passive_houses:certificat
- EnerPHit – the Passive House Certificate for retrofits
- ive House Certificate for retrofits ====== It is not always possible to achieve the Passive House Sta... ng:thermal_protection:windows|windows]] (there is no reason why Passive-House-suitable windows should not be used whenever the opportunity arises) * [[:... influence_the_energy_balance_and_affordability_of_non-residential_enerphit_projects|Factors that influ
- The Passive House Classes: Classic, Plus and Premium
- rgy” houses in many cases, whilst high-rises will not be penalised for not achieving “net-zero”. [{{:picopen:per_landing_fig_5.png?nolink&943x212 |**In both situations shown the total... [{{:picopen:per_generationpbf_bronwynbarry.jpg?nolink&600|**Using the projected building footprint
- Certification of terraced houses and semi-detached/duplex houses according to Passive House Institute criteria
- energy demand for all terraced houses in total is not higher than with method 2. However, it is import... the heating system (supply air heating alone may not be sufficient). The end-of-terrace houses are ... is valid only for that specific unit/dwelling and not for the entire row/terraced housing development.... eria for the Passive House, EnerPHit and PHI Low Energy Building Standard]]. As of 04 November 2021
- Criteria for buildings in other languages @certification:certified_passive_houses
- promotion of the Passive House concept but please note that they are for** information purposes only and not binding**. If you wish to translate building ce... open:20130604_passivehouse_certification_criteria_nonresidential_bg.pdf|Non-residential in Bulgarian}} \\ {{:picopen:20130604_enerphit_certification_crite
- Certification of Passive House office buildings @certification:certified_passive_houses
- area being the “treated floor area” of the PHPP, not the office area). From the PHI’s experience this... y and also because the use of a building is often not permanent and not always prior known. A certain pattern of usage may change after a couple of year... rtification with the standard internal gains will not be counterproductive for the higher occupancy le
- Building Certification Guide (valid with "Criteria for Buildings" 10b and earlier)
- { :picopen:phi_building_certification_guide_.jpg?nolink&500}} ===== English ===== [[https://passiv