Fulltext results:
- Riedberg Passive House School, Frankfurt, Germany
- alues. Mostly, the temperature limit of 27 °C was not achieved, for 10 % of the usage period, it could ... project planning, an air conditioning system was not necessary.\\ \\ ==== Air quality ==== An accept... the consumption was **22.0 kWh/(m²a)** if this is not taken into account. In the mild winter that follo... mption in comparison with the planned value could not be fully explained, despite the taking into accou
- Riedberg Passive House School, Frankfurt, Germany @examples:non-residential_buildings:passive_house_schools:central_europe
- alues. Mostly, the temperature limit of 27 °C was not achieved, for 10 % of the usage period, it could ... project planning, an air conditioning system was not necessary.\\ \\ ==== Air quality ==== An accept... the consumption was **22.0 kWh/(m²a)** if this is not taken into account. In the mild winter that follo... mption in comparison with the planned value could not be fully explained, despite the taking into accou
- Secondary School in Baesweiler, Germany
- t, and if necessary, switched off completely when not required.\\ \\ For the sports hall, a thermal sol
- Secondary School in Baesweiler, Germany @examples:non-residential_buildings:passive_house_schools:central_europe
- t, and if necessary, switched off completely when not required.\\ \\ For the sports hall, a thermal sol