Fulltext results:
- Riedberg Passive House School, Frankfurt, Germany
- d in November 2004 after a construction period of only 14 months. The building with a dual-field sports ... door air and indoor surface temperatures** differ only slightly from each other. In the winter of 2005/2... he mild winter that followed, the consumption was only **14.5 kWh/(m²a)**. The reason for a previously e... lance results in: * a **final energy value** of only **50.9 kWh/(m²a)** for all applications (heating,
- Secondary School in Baesweiler, Germany
- l! The measure is unique because so far there are only two existing buildings that have been certified a... ng was also energy-optimised. Areas that are used only sporadically are lighted up as required by means