• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin » out

out

Search

You can find the results of your search below.

Contains
  • Exact match
  • Starts with
  • Ends with
  • Contains
@planning:airtight_construction
  • Any namespace
  • planning:airtight_construction:general_principles (4)
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Fulltext results:

Airtightness measurements in Passive Houses
14 Hits, Last modified: 2 years ago
ive Houses ====== ===== Instructions for carrying out measurements ===== Airtightness measurements in Passive House buildings are to be carried out uniformly worldwide according to ISO 9972, method... erence volume for passive houses is to be carried out according to the procedure listed below which is ... for each room. The calculation should be carried out in accordance with detailed rules given in the [[
Airtightness Measurement of High-Rise Buildings
3 Hits, Last modified: 3 years ago
Institute (PHI) has produced a guide for carrying out airtightness measurements in high-rise buildings.... e bottom and the top (thermal) is, for example, about 48 Pa for an 80 m high building and a temperature difference (inside/outside) of 15 K. This means that pressure difference... circumstances. In order to still be able to carry out the measurement in a high-rise building, practica
Checklist: Test reports of airtightness measurements @planning:airtight_construction:general_principles
3 Hits, Last modified: 23 months ago
* Measurement standard (norm) * Inside and outdoor temperatures * Wind velocity * Fl... f the building envelope been recorded (sealing of outdoor air and exhaust air ducts at least)? * Has ... detection at negative pressure should be carried out before the measurements, and any large leaks shou
Why build an airtight house? – Leakage problems @planning:airtight_construction:general_principles
3 Hits, Last modified: 6 years ago
\\ moist air can flow from the inside towards the outside and thus\\ lead to condensation on colder par... omponents. As the illustration shows, air flowing out from leaks transports substantial amounts of mois... nto the construction. As the air cools on the way out, the water in the air condenses and remains insid
General principles for improving airtightness @planning:airtight_construction:general_principles
3 Hits, Last modified: 10 years ago
errupted airtight building envelope", that can be outlined using the “red pencil method” (see the //**f... ace the whole building envelope with a pencil without any breaks in each sectional drawing. In the deta... a planning task**. Craftsman can only carry this out in an airtight manner if it has been thoroughly d... the other, this won’t stop the water from leaking out! It is essential that the concept for airtightne
Airtightness test @planning:airtight_construction:general_principles
2 Hits, Last modified: 7 years ago
reated between the inside of the building and the outside by means of a blower door test. The blower do... b>-values) should not exceed 3 h<sup>-1</sup> without ventilation systems and 1.5 h<sup>-1</sup> with

Page Tools

  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN