Fulltext results:
- Aspects of efficient ventilation in hospitals @planning:non-residential_passive_house_buildings:ph_hospitals
- tional efficiency is by optimizing the design and outdoor air demand controls along with reducing press... ion potential. \\ \\ ===== Demand and control of outdoor air ===== Many areas in a clinic use medical... ng load in specific rooms determines the need for outdoor air in a lot of ventilation plans for hospita... s and decoupling cooling demand from the need for outdoor air, outdoor air exchange rates can be reduce
- Insulation works – Evidence no.1 "Measurements at a highly insulated wall" @planning:thermal_protection:thermal_protection_works
- to the exterior of the wall and plastered on the outside.\\ \\ |{{ :picopen:insulation _works.png?600 ... section of the brick wall stays warm even at low outside temperatures\\ since it is protected by the h... * inside the insulation layer (12 cm below the outer surface, yellow diamond) * just below the outer surface of the exterior plaster (blue square)
- Overall retrofit plan for step-by-step retrofits to EnerPHit Standard @planning:refurbishment_with_passive_house_components
- –Europe (IEE) programme, deep renovations carried out step by step have been the focus of a consortium ... ctor is significant: According to a study carried out by the German Federal Institute for Research on B... ?750 | Figure 1: EuroPHit case study projects}}] Out of 20 pilot projects started within EuroPHit, 11 ... on process ===== If energy retrofits are carried out in several individual consecutive steps, then pre
- Airtightness and airtightness measurement @planning:refurbishment_with_passive_house_components:thermal_envelope
- ngs. However air movement is greatly dependent on outside wind speeds and the stack effect within the b... * the effectiveness of the thermal insulation without air flowing through it Two similar terms should ... he building envelope, from the inside towards the outside or vice versa. __Wind__tightness is complete... ticularly large, the pressure test can be carried out using several blower fans. In accordance with the
- Thermal insulation @planning:thermal_protection
- lding elements which separate the inside from the outside. Its main purpose is to provide for a comfortable indoor climate – irrespective of the outdoor climate which is determined by the weather. ... he building envelope is usually higher than it is outside. As a result, heat is lost through the envelo... nside of the building cools down adjusting to the outdoor temperature. The inverse applies for hot clim
- Airtightness measurements in Passive Houses @planning:airtight_construction
- ive Houses ====== ===== Instructions for carrying out measurements ===== Airtightness measurements in Passive House buildings are to be carried out uniformly worldwide according to ISO 9972, method... erence volume for passive houses is to be carried out according to the procedure listed below which is ... for each room. The calculation should be carried out in accordance with detailed rules given in the [[
- Energy balances - Background @planning:calculating_energy_efficiency
- ly convenient to opt for the balance limit on the outside of the thermally insulated external building ... iciency:Energy balances - Background#Discussion about the purpose of heating]]).\\ \\ |{{ :picopen:bila... s ===== Let us look at a heat flow which travels out of the balance area through the envelope, e.g. wa... in living comfort. Therefore, the energy flowing out has to be replaced: another heat flow must trave
- Introduction: Retail stores as Passive Houses @planning:non-residential_passive_house_buildings
- tween retail stores with cooling of goods, or without. There are such large heat flows in the open refr... d building envelopes have to be cooled all throughout the year. Increasingly longer opening hours also ... e construction costs and in the form of halls without columns, which has resulted in a typical building... igeration installation is disposed of towards the outside so that internal heating loads can be limited
- Refurbishment with Passive House components - introduction @planning:refurbishment_with_passive_house_components
- terature|[AKKP-32] ]]. The challenges of carrying out individual renovation measures and ways to achiev... prehensive metrological examinations were carried out by the Passive House Institute, the results of wh... \\ constructions alike. If it is properly carried out, the facade\\ will not need to be renovated again... that it would be practically impossible to carry out “subsequent improvement“ with justifiable effort:
- Types of ventilation @planning:building_services:ventilation:basics
- priority than energy conservation - but it turns out that there is no conflict at all, if efficient co... ==== Purge ventilation through windows ===== Without comfort ventilation, adequate air exchange in new... ilation. In order to achieve an air exchange of about 0.33 ach (air change per hour), one would have to... her. You can find more information on the page about [[planning:building services:Ventilation:Basics:A
- Insulation vs. thermal mass @planning:thermal_protection:thermal_protection_works
- en". Strictly speaking, that is in fact true: without resorting to fundamental, unproved principles, th... ound the Sun. The same applies for the findings about climate change and for current research about evolution, for example.\\ \\ On the face of it, reputabl... using statistical methods something can be said about the reliability with which energy can be saved th
- Outdoor thermography @planning:thermal_protection:thermal_protection_works
- ====== Outdoor thermography ====== Outdoor thermographies provide independent evidence that insulating buildings... ===== Infrared thermography with insulation / without insulation ===== The infrared imaging technique ... ilding. The modernisation was planned and carried out by the architect [[http://www.schulze-darup.de/29
- Dynamic simulation of a building's thermal performance @planning:calculating_energy_efficiency
- y introduced in the natural sciences. It goes without saying that discretization errors and numerical e... el: even the parameter studies, which are carried out in [Feist 1994] with great effort, are not suitab... are also practical advantages in favor of such a route: numerical mathematics often offers different me... ildings, there is a widespread basic skepticism about simulation: Many practitioners only trust stateme
- Step-by-step Retrofits towards EnerPHit Standard in social housing in Spain @planning:refurbishment_with_passive_house_components
- shment Examples in Spain ===== The works carried out within the European project EuroPHit helped us to... f the existing building. The possibility to carry out the works without being determined by third parties, as, for example, a neighbourhood association, has... ed so that it is not interesting to contemplate about higher thicknesses, which would reduce the interi
- Climate data tool for the southern hemisphere
- ======Climate data tool for the southern hemisphere====== This tool and description is valid for PHPP ... on 9 (and earlier). When using the PHPP in the Southern Hemisphere, all climate data must first be ma... mes that main solar radiation is coming from the South. * Therefore, the radiation data must be enter... coming from the North is placed in the field for South radiation and vice versa. * Due to this chang
- Comparison of energy performance of ventilation systems using passive vs. active heat recovery @planning:building_services:ventilation
- Internal heat gains in relation to living area @planning:calculating_energy_efficiency:phpp_-_the_passive_house_planning_package
- Building Integrated Photovoltaics (BIPV) in Step by Step Retrofitting Projects @planning:refurbishment_with_passive_house_components
- Economic analysis for the retrofit of a detached single family house to the EnerPHit standard @planning:refurbishment_with_passive_house_components
- Improving thermal bridges and airtightness in existing buildings @planning:refurbishment_with_passive_house_components:thermal_envelope
- Checklist: Test reports of airtightness measurements @planning:airtight_construction:general_principles
- Passive House - 6 reasons why you still need opening windows @planning:building_services:ventilation
- PHPP calculations in hot and humid climates @planning:calculating_energy_efficiency:phpp_-_the_passive_house_planning_package
- Passive House schools – How to go about it @planning:non-residential_passive_house_buildings:passive_house_schools
- Floor Replacement: Svartbäcksvägen @planning:refurbishment_with_passive_house_components:thermal_envelope
- “designPH” plugin for Trimble Sketchup @planning:calculating_energy_efficiency:phpp_-_the_passive_house_planning_package
- PHPP - validated and proven in practice @planning:calculating_energy_efficiency:phpp_-_the_passive_house_planning_package
- Variant calculations and economic assessment with PHPP 9 @planning:calculating_energy_efficiency:phpp_-_the_passive_house_planning_package
- Energy efficiency in cafeterias and commercial kitchens @planning:non-residential_passive_house_buildings:cafeterias_and_commercial_kitchens
- Ventilation in commercial kitchens @planning:non-residential_passive_house_buildings:cafeterias_and_commercial_kitchens
- Passive House Schools - Boundary Conditions @planning:non-residential_passive_house_buildings:passive_house_schools
- Baseline study - implementing the Passive House concept in hospitals @planning:non-residential_passive_house_buildings:ph_hospitals
- Energy use for heating in a well insulated new building @planning:thermal_protection:thermal_protection_works
- Comparison of in-situ measurements and hygrothermal simulations of four different interior insulation systems @planning:thermal_protection:thermal_protection_works:comparison_of_in_situ_measurements_and_hygrothermal_simulations_of_four_different_interior_insulation_systems
- Component Award 2016: Affordable ventilation solutions for retrofits @planning:refurbishment_with_passive_house_components
- Step-by-step deep retrofit and building integrated façade/roof on a 'million program' house @planning:refurbishment_with_passive_house_components