• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin » out

out

Search

You can find the results of your search below.

Ends with
  • Exact match
  • Starts with
  • Ends with
  • Contains
@examples
  • Any namespace
  • examples:non-residential_buildings (5)
  • examples:residential_buildings (4)
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Fulltext results:

The world’s first Passive House, Darmstadt-Kranichstein, Germany @examples:residential_buildings:multi-family_buildings:central_europe
9 Hits, Last modified: 16 months ago
r standardisation, calculations are still carried out using values that are far too optimistic((This is... ng, sealing with polyethylene sheeting bonded without jointing, gypsum plasterboard 12.5 mm, wood-chip ... ating. The flat-collector thermal system covers about 66% of the dhw consumption in the Passive House i... ntinuous interior plaster or vapour retarders without any gaps – as appropriate from a building physics
Riedberg Passive House School, Frankfurt, Germany @examples:non-residential_buildings:passive_house_schools
5 Hits, Last modified: 6 years ago
ion phase, accompanying research was also carried out on behalf of the City of Frankfurt by the Passive House Institute. Data acquisition was carried out over a period of about 30 months and supplemented by numerous special measurements.\\ \\ ===== Result... rst years (insulation apron approach), the drying out of the building and the lack of some optimisation
Riedberg Passive House School, Frankfurt, Germany @examples:non-residential_buildings:passive_house_schools:central_europe
3 Hits, Last modified: 11 years ago
ion phase, accompanying research was also carried out on behalf of the City of Frankfurt by the Passive House Institute. Data acquisition was carried out over a period of about 30 months and supplemented by numerous special measurements.\\ \\ ===== Result... rst years (insulation apron approach), the drying out of the building and the lack of some optimisation
Playing on the Passive House hill - the new kindergarten in the Heidenau city park @examples:non-residential_buildings:passive_house_kindergartens:central_europe
2 Hits, Last modified: 11 years ago
and the undulating roof that seems to be “growing out of” the landscape integrates very well into the s... azed, providing a clear view of the park. The layout of the floor plan offers an interesting additiona... ation. Minimum temperature monitoring is carried out in the building. If the temperature falls below 1
Multi-family Passive House buildings in Germany @examples:residential_buildings:multi-family_buildings:central_europe
2 Hits, Last modified: 6 years ago
24 low-energy houses at the same site, carried\\ out by the Institute for Housing and Environment (IWU... 400 }}| |This **Passive House retrofit**, carried out by GAG in Ludwigshafen\\ was presented by Andrè Z
The Nestwerk Residential Project in Dresden @examples:residential_buildings:multi-family_buildings:central_europe
2 Hits, Last modified: 11 years ago
installations, heating ventilation) amounts to about 17%. If only heating and ventilation are taken into account, this share is about 9 % (//**Table 1**//). On the basis of these val... ative analysis for a low-energy house was carried out the results of which were used for a dynamic econ... ogical Passive House. Clients do not want to miss out on the design quality of their houses in order to
Secondary School in Baesweiler, Germany @examples:non-residential_buildings:passive_house_schools
1 Hits, Last modified: 8 years ago
of all official building stock in a well-thought-out course of action. As a first step, 21 local autho
Secondary School in Baesweiler, Germany @examples:non-residential_buildings:passive_house_schools:central_europe
1 Hits, Last modified: 11 years ago
of all official building stock in a well-thought-out course of action. As a first step, 21 local autho
St. Josef Caritas-Haus, Germany - the first prefabricated large module Passive House nursing home @examples:residential_buildings:nursing_homes:central_europe
1 Hits, Last modified: 11 years ago
to share two rooms (living room and bedroom). Without great effort, one shower room can be converted in... o two separate single rooms again is possible without great effort. In this way, it can be ensured that... semble the modules on site in just a few days without the usual construction site inconveniences of noi... ity, heating and water still needed to be carried out.\\ \\ |{{ :picopen:caritas_haus_st_josef_fig_6.jp

Page Tools

  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN