Fulltext results:
- Airtightness and airtightness measurement
- * the effectiveness of the thermal insulation without air flowing through it Two similar terms should ... ticularly large, the pressure test can be carried out using several blower fans. In accordance with the... g the measurement it is always advisable to carry out a series of negative AND excess pressures so that... n contrast, the actual test normally takes only about 30 to 40 minutes, therefore saving time here woul
- Improving thermal bridges and airtightness in existing buildings
- gnificant thermal bridges: * Masonry projecting out of the envelope at the knee wall * Wood beam c... uction, but specific solutions needs to be worked out for a number of the details in old buildings. One... ope at the level of the old exterior plaster. Without careful airtight connection of each of the indivi
- Floor Replacement: Svartbäcksvägen
- is, the old, non-insulated concrete floor was dug out and replaced by a new floor with 300mm FOAMGLAS® ... ics.png?550|}}] On the outside, the earth is dug out, new drainage pipes are positioned and the trench
- Insulation measures for the external envelope
- ==== Modernisation of the building envelope without insulation ("cosmetic refurbishment") is not effi