• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin » out

out

Search

You can find the results of your search below.

Ends with
  • Exact match
  • Starts with
  • Ends with
  • Contains
@planning:refurbishment_with_passive_house_components
  • Any namespace
  • planning:refurbishment_with_passive_house_components:thermal_envelope (4)
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Fulltext results:

Overall retrofit plan for step-by-step retrofits to EnerPHit Standard
12 Hits, Last modified: 6 years ago
–Europe (IEE) programme, deep renovations carried out step by step have been the focus of a consortium ... ctor is significant: According to a study carried out by the German Federal Institute for Research on B... ?750 | Figure 1: EuroPHit case study projects}}] Out of 20 pilot projects started within EuroPHit, 11 ... on process ===== If energy retrofits are carried out in several individual consecutive steps, then pre
Airtightness and airtightness measurement @planning:refurbishment_with_passive_house_components:thermal_envelope
12 Hits, Last modified: 10 months ago
* the effectiveness of the thermal insulation without air flowing through it Two similar terms should ... ticularly large, the pressure test can be carried out using several blower fans. In accordance with the... g the measurement it is always advisable to carry out a series of negative AND excess pressures so that... n contrast, the actual test normally takes only about 30 to 40 minutes, therefore saving time here woul
Refurbishment with Passive House components - introduction
10 Hits, Last modified: 6 years ago
terature|[AKKP-32] ]]. The challenges of carrying out individual renovation measures and ways to achiev... prehensive metrological examinations were carried out by the Passive House Institute, the results of wh... \\ constructions alike. If it is properly carried out, the facade\\ will not need to be renovated again... that it would be practically impossible to carry out “subsequent improvement“ with justifiable effort:
Step-by-step Retrofits towards EnerPHit Standard in social housing in Spain
6 Hits, Last modified: 9 years ago
shment Examples in Spain ===== The works carried out within the European project EuroPHit helped us to... f the existing building. The possibility to carry out the works without being determined by third parties, as, for example, a neighbourhood association, has... ed so that it is not interesting to contemplate about higher thicknesses, which would reduce the interi
Economic analysis for the retrofit of a detached single family house to the EnerPHit standard
4 Hits, Last modified: 6 years ago
* The position of the ventilation unit and layout of extract ducts * The Lambda value of wall in... e variability. We can use the phEco model to find out if investing in EnerPHit is robust, given uncerta... present value). A sensitivity analysis is carried out with the Crystal Ball Excel Plug-In. \\ Realist... igher efficiency pay off?** \\ The ventilation layout could be improved: extract ducts were placed in t
Windows in a step-by-step retrofit
4 Hits, Last modified: 9 years ago
nsulation added to it. All other solutions turned out to be detrimental: If the frame is installed deep... l costs, and sealing off the resulting bays turns out to be difficult. In addition, the jury for the 20... the new window placed in the planned position without requiring any other work on the thermal insulatio... to the outside; the guide rails are then farther out and do not have any significant thermal bridge ef
Improving thermal bridges and airtightness in existing buildings @planning:refurbishment_with_passive_house_components:thermal_envelope
3 Hits, Last modified: 6 years ago
gnificant thermal bridges: * Masonry projecting out of the envelope at the knee wall * Wood beam c... uction, but specific solutions needs to be worked out for a number of the details in old buildings. One... ope at the level of the old exterior plaster. Without careful airtight connection of each of the indivi
Building Integrated Photovoltaics (BIPV) in Step by Step Retrofitting Projects
2 Hits, Last modified: 6 years ago
nder hot climate conditions. Measurements carried out with a-Si photovoltaic glazing show a significant... ovides a complete flexibility in transparency without compromising the capability of the natural sun li
Floor Replacement: Svartbäcksvägen @planning:refurbishment_with_passive_house_components:thermal_envelope
2 Hits, Last modified: 8 years ago
is, the old, non-insulated concrete floor was dug out and replaced by a new floor with 300mm FOAMGLAS® ... ics.png?550|}}] On the outside, the earth is dug out, new drainage pipes are positioned and the trench
Step-by-step deep retrofit and building integrated façade/roof on a 'million program' house
1 Hits, Last modified: 5 years ago
cy sensor based lighting will be installed throughout the building. Finally, sensors to collect data fr... €/m² (material and labour) and a wood façade is about 70 €/m² [6]. In this sense, the cost for the sola
Insulation measures for the external envelope @planning:refurbishment_with_passive_house_components:thermal_envelope
1 Hits, Last modified: 6 years ago
==== Modernisation of the building envelope without insulation ("cosmetic refurbishment") is not effi

Page Tools

  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN