- Overall retrofit plan for step-by-step retrofits to EnerPHit Standard
- –Europe (IEE) programme, deep renovations carried out step by step have been the focus of a consortium ... ctor is significant: According to a study carried out by the German Federal Institute for Research on B... ?750 | Figure 1: EuroPHit case study projects}}] Out of 20 pilot projects started within EuroPHit, 11 ... on process ===== If energy retrofits are carried out in several individual consecutive steps, then pre
- Airtightness and airtightness measurement @planning:refurbishment_with_passive_house_components:thermal_envelope
- * the effectiveness of the thermal insulation without air flowing through it Two similar terms should ... ticularly large, the pressure test can be carried out using several blower fans. In accordance with the... g the measurement it is always advisable to carry out a series of negative AND excess pressures so that... n contrast, the actual test normally takes only about 30 to 40 minutes, therefore saving time here woul
- Refurbishment with Passive House components - introduction
- terature|[AKKP-32] ]]. The challenges of carrying out individual renovation measures and ways to achiev... prehensive metrological examinations were carried out by the Passive House Institute, the results of wh... \\ constructions alike. If it is properly carried out, the facade\\ will not need to be renovated again... that it would be practically impossible to carry out “subsequent improvement“ with justifiable effort:
- Step-by-step Retrofits towards EnerPHit Standard in social housing in Spain
- shment Examples in Spain ===== The works carried out within the European project EuroPHit helped us to... f the existing building. The possibility to carry out the works without being determined by third parties, as, for example, a neighbourhood association, has... ed so that it is not interesting to contemplate about higher thicknesses, which would reduce the interi
- Economic analysis for the retrofit of a detached single family house to the EnerPHit standard
- * The position of the ventilation unit and layout of extract ducts * The Lambda value of wall in... e variability. We can use the phEco model to find out if investing in EnerPHit is robust, given uncerta... present value). A sensitivity analysis is carried out with the Crystal Ball Excel Plug-In. \\ Realist... igher efficiency pay off?** \\ The ventilation layout could be improved: extract ducts were placed in t
- Windows in a step-by-step retrofit
- nsulation added to it. All other solutions turned out to be detrimental: If the frame is installed deep... l costs, and sealing off the resulting bays turns out to be difficult. In addition, the jury for the 20... the new window placed in the planned position without requiring any other work on the thermal insulatio... to the outside; the guide rails are then farther out and do not have any significant thermal bridge ef
- Improving thermal bridges and airtightness in existing buildings @planning:refurbishment_with_passive_house_components:thermal_envelope
- gnificant thermal bridges: * Masonry projecting out of the envelope at the knee wall * Wood beam c... uction, but specific solutions needs to be worked out for a number of the details in old buildings. One... ope at the level of the old exterior plaster. Without careful airtight connection of each of the indivi
- Building Integrated Photovoltaics (BIPV) in Step by Step Retrofitting Projects
- nder hot climate conditions. Measurements carried out with a-Si photovoltaic glazing show a significant... ovides a complete flexibility in transparency without compromising the capability of the natural sun li
- Floor Replacement: Svartbäcksvägen @planning:refurbishment_with_passive_house_components:thermal_envelope
- is, the old, non-insulated concrete floor was dug out and replaced by a new floor with 300mm FOAMGLAS® ... ics.png?550|}}] On the outside, the earth is dug out, new drainage pipes are positioned and the trench
- Step-by-step deep retrofit and building integrated façade/roof on a 'million program' house
- cy sensor based lighting will be installed throughout the building. Finally, sensors to collect data fr... €/m² (material and labour) and a wood façade is about 70 €/m² [6]. In this sense, the cost for the sola
- Insulation measures for the external envelope @planning:refurbishment_with_passive_house_components:thermal_envelope
- ==== Modernisation of the building envelope without insulation ("cosmetic refurbishment") is not effi