• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin » out

out

Search

You can find the results of your search below.

Starts with
  • Exact match
  • Starts with
  • Ends with
  • Contains
@planning:refurbishment_with_passive_house_components:thermal_envelope
  • Any namespace
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Fulltext results:

Airtightness and airtightness measurement
9 Hits, Last modified: 10 months ago
ngs. However air movement is greatly dependent on outside wind speeds and the stack effect within the b... he building envelope, from the inside towards the outside or vice versa. __Wind__tightness is complete... ticularly large, the pressure test can be carried out using several blower fans. In accordance with the... fference of at least 25 Pa between the inside and outside is achieved for large buildings (more than 40
Improving thermal bridges and airtightness in existing buildings
4 Hits, Last modified: 6 years ago
gnificant thermal bridges: * Masonry projecting out of the envelope at the knee wall * Wood beam c... ally, the details with improved insulation on the outside have higher interior surface temperatures. Th... With the Passive House level of insulation on the outside, one can be sure to remain on the safe side f... uction, but specific solutions needs to be worked out for a number of the details in old buildings. One
Floor Replacement: Svartbäcksvägen
3 Hits, Last modified: 8 years ago
is, the old, non-insulated concrete floor was dug out and replaced by a new floor with 300mm FOAMGLAS® ... [{{:picopen:thermal_grapics.png?550|}}] On the outside, the earth is dug out, new drainage pipes are positioned and the trench is filled with FOAMGLAS® g

Page Tools

  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN