Fulltext results:
- Overall retrofit plan for step-by-step retrofits to EnerPHit Standard
- –Europe (IEE) programme, deep renovations carried out step by step have been the focus of a consortium ... ctor is significant: According to a study carried out by the German Federal Institute for Research on B... ?750 | Figure 1: EuroPHit case study projects}}] Out of 20 pilot projects started within EuroPHit, 11 ... on process ===== If energy retrofits are carried out in several individual consecutive steps, then pre
- Refurbishment with Passive House components - introduction
- terature|[AKKP-32] ]]. The challenges of carrying out individual renovation measures and ways to achiev... prehensive metrological examinations were carried out by the Passive House Institute, the results of wh... \\ constructions alike. If it is properly carried out, the facade\\ will not need to be renovated again... that it would be practically impossible to carry out “subsequent improvement“ with justifiable effort:
- Step-by-step Retrofits towards EnerPHit Standard in social housing in Spain
- shment Examples in Spain ===== The works carried out within the European project EuroPHit helped us to... f the existing building. The possibility to carry out the works without being determined by third parti... ness works between neighbouring flats are carried out. \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ === 3.... ing. Madrid City regulations do not allow placing outside elements, such as outdoor and exhaust air gri
- Airtightness and airtightness measurement @planning:refurbishment_with_passive_house_components:thermal_envelope
- ngs. However air movement is greatly dependent on outside wind speeds and the stack effect within the b... he building envelope, from the inside towards the outside or vice versa. __Wind__tightness is complete... ticularly large, the pressure test can be carried out using several blower fans. In accordance with the... fference of at least 25 Pa between the inside and outside is achieved for large buildings (more than 40
- Windows in a step-by-step retrofit
- nsulation added to it. All other solutions turned out to be detrimental: If the frame is installed deep... l costs, and sealing off the resulting bays turns out to be difficult. In addition, the jury for the 20... the roller shutter box contains more or less cold outdoor air, insulation does not have any advantages.... ould then be insulated and made airtight from the outside, and a new darkening/shading option should be
- Building Integrated Photovoltaics (BIPV) in Step by Step Retrofitting Projects
- the inner part, an air gap and PV modules in the outer layer. This system could be implemented to red... ins and losses, between the controlled indoor and outdoor environment with thermal transmittance values. In an ideal situation, the inner and outer temperatures of a wall would remain constant. T... n contrast to the ideal condition, the indoor and outdoor temperatures are not so steady. Therefore, t
- Improving thermal bridges and airtightness in existing buildings @planning:refurbishment_with_passive_house_components:thermal_envelope
- gnificant thermal bridges: * Masonry projecting out of the envelope at the knee wall * Wood beam c... ally, the details with improved insulation on the outside have higher interior surface temperatures. Th... With the Passive House level of insulation on the outside, one can be sure to remain on the safe side f... uction, but specific solutions needs to be worked out for a number of the details in old buildings. One
- Economic analysis for the retrofit of a detached single family house to the EnerPHit standard
- led U value 0.85W/(m².K)), installed flush on the outer face of the concrete wall and equipped with mov... e variability. We can use the phEco model to find out if investing in EnerPHit is robust, given uncerta... present value). A sensitivity analysis is carried out with the Crystal Ball Excel Plug-In. \\ Realist
- Floor Replacement: Svartbäcksvägen @planning:refurbishment_with_passive_house_components:thermal_envelope
- is, the old, non-insulated concrete floor was dug out and replaced by a new floor with 300mm FOAMGLAS® ... [{{:picopen:thermal_grapics.png?550|}}] On the outside, the earth is dug out, new drainage pipes are positioned and the trench is filled with FOAMGLAS® g
- Component Award 2016: Affordable ventilation solutions for retrofits
- ndependent jury assessed these factors. ===== 5. Outlook ===== At the time this paper was written, su