Fulltext results:
- Aspects of efficient ventilation in hospitals @planning:non-residential_passive_house_buildings:ph_hospitals
- tional efficiency is by optimizing the design and outdoor air demand controls along with reducing press... ion potential. \\ \\ ===== Demand and control of outdoor air ===== Many areas in a clinic use medical... ng load in specific rooms determines the need for outdoor air in a lot of ventilation plans for hospita... s and decoupling cooling demand from the need for outdoor air, outdoor air exchange rates can be reduce
- Insulation works – Evidence no.1 "Measurements at a highly insulated wall" @planning:thermal_protection:thermal_protection_works
- to the exterior of the wall and plastered on the outside.\\ \\ |{{ :picopen:insulation _works.png?600 ... section of the brick wall stays warm even at low outside temperatures\\ since it is protected by the h... * inside the insulation layer (12 cm below the outer surface, yellow diamond) * just below the outer surface of the exterior plaster (blue square)
- Airtightness measurements in Passive Houses @planning:airtight_construction
- ive Houses ====== ===== Instructions for carrying out measurements ===== Airtightness measurements in Passive House buildings are to be carried out uniformly worldwide according to ISO 9972, method... erence volume for passive houses is to be carried out according to the procedure listed below which is ... for each room. The calculation should be carried out in accordance with detailed rules given in the [[
- Overall retrofit plan for step-by-step retrofits to EnerPHit Standard @planning:refurbishment_with_passive_house_components
- –Europe (IEE) programme, deep renovations carried out step by step have been the focus of a consortium ... ctor is significant: According to a study carried out by the German Federal Institute for Research on B... ?750 | Figure 1: EuroPHit case study projects}}] Out of 20 pilot projects started within EuroPHit, 11 ... on process ===== If energy retrofits are carried out in several individual consecutive steps, then pre
- Refurbishment with Passive House components - introduction @planning:refurbishment_with_passive_house_components
- terature|[AKKP-32] ]]. The challenges of carrying out individual renovation measures and ways to achiev... prehensive metrological examinations were carried out by the Passive House Institute, the results of wh... \\ constructions alike. If it is properly carried out, the facade\\ will not need to be renovated again... that it would be practically impossible to carry out “subsequent improvement“ with justifiable effort:
- Outdoor thermography @planning:thermal_protection:thermal_protection_works
- ====== Outdoor thermography ====== Outdoor thermographies provide independent evidence that insulating buildings... ilding. The modernisation was planned and carried out by the architect [[http://www.schulze-darup.de/29... taken. The modernisation was planned and carried out in an exemplary way reducing the energy use for h
- Insulation vs. thermal mass @planning:thermal_protection:thermal_protection_works
- uninsulated wall conducts the heat\\ towards the outside surface which radiates heat into the surround... reduces the flow of heat from\\ the inside to the outside quite considerably. The new plaster surface h... : * For normal building components, it turns out that to a great extent, the heat storage effect already averages out over a period of a few days (see the explanation
- Thermal insulation @planning:thermal_protection
- lding elements which separate the inside from the outside. Its main purpose is to provide for a comfortable indoor climate – irrespective of the outdoor climate which is determined by the weather. ... he building envelope is usually higher than it is outside. As a result, heat is lost through the envelo... nside of the building cools down adjusting to the outdoor temperature. The inverse applies for hot clim
- PHLuft
- t Tool consists of the following parts: * Heat output * Ground heat exchanger * Heat exchanger ... ve House ventilation systems in his work. **Heat output** With the help of this part of the Tool, you... or vertical sections. To calculate the supply air outlet temperature at the supply air valve, you must ... rting after the post-heating coil. The calculated outlet temperature of the first section is therefore
- Energy balances - Background @planning:calculating_energy_efficiency
- ly convenient to opt for the balance limit on the outside of the thermally insulated external building ... s ===== Let us look at a heat flow which travels out of the balance area through the envelope, e.g. wa... in living comfort. Therefore, the energy flowing out has to be replaced: another heat flow must travel from the outside towards the inside in order to keep the tempe
- Step-by-step Retrofits towards EnerPHit Standard in social housing in Spain @planning:refurbishment_with_passive_house_components
- shment Examples in Spain ===== The works carried out within the European project EuroPHit helped us to... f the existing building. The possibility to carry out the works without being determined by third parti... ness works between neighbouring flats are carried out. \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ === 3.... ing. Madrid City regulations do not allow placing outside elements, such as outdoor and exhaust air gri
- Airtightness and airtightness measurement @planning:refurbishment_with_passive_house_components:thermal_envelope
- ngs. However air movement is greatly dependent on outside wind speeds and the stack effect within the b... he building envelope, from the inside towards the outside or vice versa. __Wind__tightness is complete... ticularly large, the pressure test can be carried out using several blower fans. In accordance with the... fference of at least 25 Pa between the inside and outside is achieved for large buildings (more than 40
- Introduction: Retail stores as Passive Houses @planning:non-residential_passive_house_buildings
- igeration installation is disposed of towards the outside so that internal heating loads can be limited... t least in part, is usually extracted towards the outside by means of a refrigeration installation with... technology, this can be ensured with an installed output of about 5 W/m². In order to present (supposed... goods in an optimal manner, the actual installed outputs are often much higher with around 30 W/m², an
- Thermal protection and modernisation of existing buildings @planning:planning
- s assumed that a majority of retrofits is carried out partially, often single measures only, and buildi... c planning or quality assurance is rarely carried out in such instances. In many countries, single meas... nce of the investor or building owner and carried out by a contractor with a more or less moderate know... asure of step-by-step retrofits should be carried out according to high quality standards and a sound r
- Dynamic simulation of a building's thermal performance @planning:calculating_energy_efficiency
- el: even the parameter studies, which are carried out in [Feist 1994] with great effort, are not suitab... influenced in summer by changing the color of the outer facade? Questions of these types can also be a... y of about 5%, the inside (and of course also the outside climate) of the two test houses would have to... inuously: the solar absorption coefficient of the outer wall from 0.2 to 0.8. Wishing to deal with all
- Comparison of energy performance of ventilation systems using passive vs. active heat recovery @planning:building_services:ventilation
- Building Integrated Photovoltaics (BIPV) in Step by Step Retrofitting Projects @planning:refurbishment_with_passive_house_components
- Internal heat gains in relation to living area @planning:calculating_energy_efficiency:phpp_-_the_passive_house_planning_package
- Improving thermal bridges and airtightness in existing buildings @planning:refurbishment_with_passive_house_components:thermal_envelope
- Economic analysis for the retrofit of a detached single family house to the EnerPHit standard @planning:refurbishment_with_passive_house_components
- Checklist: Test reports of airtightness measurements @planning:airtight_construction:general_principles
- Passive House - 6 reasons why you still need opening windows @planning:building_services:ventilation
- Floor Replacement: Svartbäcksvägen @planning:refurbishment_with_passive_house_components:thermal_envelope
- Variant calculations and economic assessment with PHPP 9 @planning:calculating_energy_efficiency:phpp_-_the_passive_house_planning_package
- Energy efficiency in cafeterias and commercial kitchens @planning:non-residential_passive_house_buildings:cafeterias_and_commercial_kitchens
- Passive House schools – How to go about it @planning:non-residential_passive_house_buildings:passive_house_schools
- Energy use for heating in a well insulated new building @planning:thermal_protection:thermal_protection_works
- Component Award 2016: Affordable ventilation solutions for retrofits @planning:refurbishment_with_passive_house_components
- PHPP calculations in hot and humid climates @planning:calculating_energy_efficiency:phpp_-_the_passive_house_planning_package
- “designPH” plugin for Trimble Sketchup @planning:calculating_energy_efficiency:phpp_-_the_passive_house_planning_package
- Ventilation in commercial kitchens @planning:non-residential_passive_house_buildings:cafeterias_and_commercial_kitchens
- Passive House Schools - Boundary Conditions @planning:non-residential_passive_house_buildings:passive_house_schools
- Baseline study - implementing the Passive House concept in hospitals @planning:non-residential_passive_house_buildings:ph_hospitals