• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin » out

out

Search

You can find the results of your search below.

Exact match
  • Exact match
  • Starts with
  • Ends with
  • Contains
@certification
  • Any namespace
  • certification:passive_house_categories (1)
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Fulltext results:

Evaluation of server and server room efficiency for non-residential buildings that exceed the primary energy criterion
5 Hits, Last modified: 16 months ago
on and less processing capacity. In order to find out whether a service is efficient or not, the power ... be put into relation to the computations carried out; the more computations it is possible to carry out per watt, the better. The SPECpower_ssj2008-Benchm... h a uniform processing capacity. If a processor out of the top 25% of the current hardware generation
Certification of buildings in which the ground floor is used for commercial purposes (for PHPP 9, revised 5-Sep-2016)
2 Hits, Last modified: 2 years ago
riods of time on the ground floor cannot be ruled out (vacant/use as a workshop etc.), then the ceiling... riods of time on the ground floor cannot be ruled out (vacant/use as a workshop etc.), then the ceiling
Certification of terraced houses and semi-detached/duplex houses according to Passive House Institute criteria
2 Hits, Last modified: 3 years ago
or individual terraced houses of a row is carried out by different parties. **Method 1** is appropriat... the chosen method is expressly agreed on and set out in written form at an early stage by all relevant
Building Certification
1 Hits, Last modified: 13 months ago
upplementary explanations of the requirements set out in the Building Criteria. In case of doubt, the r
EnerPHit – the Passive House Certificate for retrofits
1 Hits, Last modified: 20 months ago
he implementation of several projects and carries out measurements in modernised buildings. To know mo
PER-factors for electricity use: Location & application specific decarbonisation @certification:passive_house_categories
1 Hits, Last modified: 14 months ago
ase only if the additional energy demand balances out seasonal disparities and thus reduces the need fo

Page Tools

  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN