Fulltext results:
- Overall retrofit plan for step-by-step retrofits to EnerPHit Standard
- –Europe (IEE) programme, deep renovations carried out step by step have been the focus of a consortium ... ctor is significant: According to a study carried out by the German Federal Institute for Research on B... ?750 | Figure 1: EuroPHit case study projects}}] Out of 20 pilot projects started within EuroPHit, 11 ... on process ===== If energy retrofits are carried out in several individual consecutive steps, then pre
- Refurbishment with Passive House components - introduction
- terature|[AKKP-32] ]]. The challenges of carrying out individual renovation measures and ways to achiev... prehensive metrological examinations were carried out by the Passive House Institute, the results of wh... \\ constructions alike. If it is properly carried out, the facade\\ will not need to be renovated again... that it would be practically impossible to carry out “subsequent improvement“ with justifiable effort:
- Step-by-step Retrofits towards EnerPHit Standard in social housing in Spain
- shment Examples in Spain ===== The works carried out within the European project EuroPHit helped us to... f the existing building. The possibility to carry out the works without being determined by third parti... ness works between neighbouring flats are carried out. \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ === 3.... se cannot be specified since they will be carried out at the end of each component’s life cycle. The h
- Airtightness and airtightness measurement @planning:refurbishment_with_passive_house_components:thermal_envelope
- ticularly large, the pressure test can be carried out using several blower fans. In accordance with the... g the measurement it is always advisable to carry out a series of negative AND excess pressures so that... of how airtightly the suspension has been carried out. Among other things, this stipulation according t... construction details should be as simple to carry out as possible * preferably **large uniform** are
- Windows in a step-by-step retrofit
- nsulation added to it. All other solutions turned out to be detrimental: If the frame is installed deep... l costs, and sealing off the resulting bays turns out to be difficult. In addition, the jury for the 20... to the outside; the guide rails are then farther out and do not have any significant thermal bridge ef
- Economic analysis for the retrofit of a detached single family house to the EnerPHit standard
- e variability. We can use the phEco model to find out if investing in EnerPHit is robust, given uncerta... present value). A sensitivity analysis is carried out with the Crystal Ball Excel Plug-In. \\ Realist
- Floor Replacement: Svartbäcksvägen @planning:refurbishment_with_passive_house_components:thermal_envelope
- is, the old, non-insulated concrete floor was dug out and replaced by a new floor with 300mm FOAMGLAS® ... ics.png?550|}}] On the outside, the earth is dug out, new drainage pipes are positioned and the trench
- Improving thermal bridges and airtightness in existing buildings @planning:refurbishment_with_passive_house_components:thermal_envelope
- gnificant thermal bridges: * Masonry projecting out of the envelope at the knee wall * Wood beam c... uction, but specific solutions needs to be worked out for a number of the details in old buildings. One
- Building Integrated Photovoltaics (BIPV) in Step by Step Retrofitting Projects
- nder hot climate conditions. Measurements carried out with a-Si photovoltaic glazing show a significant