• skip to content

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
You are here: Cloud Plugin » possible

possible

Search

You can find the results of your search below.

Exact match
  • Exact match
  • Starts with
  • Ends with
  • Contains
@planning:airtight_construction
  • Any namespace
  • planning:airtight_construction:general_principles (4)
Any time
  • Any time
  • Past week
  • Past month
  • Past year
Sort by hits
  • Sort by hits
  • Sort by last modified

Fulltext results:

Airtightness measurements in Passive Houses
2 Hits, Last modified: 2 years ago
will have been completed already. It will not be possible to access many important connections and penetrat... oor air and exhaust air sides should be sealed if possible, in order to avoid measuring the leakages of the
Airtightness test @planning:airtight_construction:general_principles
2 Hits, Last modified: 7 years ago
tilation for acceptable indoor air quality is not possible. On the other hand, the level of airtightness is ... ness afterwards is much more\\ difficult and only possible during the course of a full\\ refurbishment.**//|
Checklist: Test reports of airtightness measurements @planning:airtight_construction:general_principles
2 Hits, Last modified: 23 months ago
General principles for improving airtightness @planning:airtight_construction:general_principles
2 Hits, Last modified: 10 years ago
the //**following illustration**//). It should be possible to trace the whole building envelope with a penci... te all necessary penetrations in as few places as possible. // // ** Insulation materials are generally
Why build an airtight house? – Leakage problems @planning:airtight_construction:general_principles
1 Hits, Last modified: 6 years ago
l envelope of a building should be as airtight as possible and this doesn’t only apply to Passive Houses.

Page Tools

  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki
    DE EN